Success stories

Maintenance Optimization

Optimizing existing lines during scheduled maintenance. A critical 220 kV line must be consigned for several months for scheduled maintenance.

Challenges & Pain Points

  • Disconnecting this line entails large costs due to re-despatch plans.

Our Solution

An adjacent line was equipped with 4 ADR Sense modules and monitored with ADR Operate real-time analysis software. For 3 months, this adjacent line could take in the additional load, namely an average 40% extra capacity.

Ampacimon solution make possible for grid operators to set up maintenance plans that are much more flexible, less constraining, less costly, and quickly underway.