Facts:

The French Alps sky resort “La Clusaz” is fed by a single 150-kV line. In the winter season, load increases very strongly, while it is very low in summer.

Constraints:

To manage this load increase in winter, the grid operator faces a large investment for only a few months use.

Ampacimon solution:

Installing the Ampacimon solution on this line granted a 40% increase in capacity of the existing line, and allows smooth operation during winter load peaks.

RELATED PRODUCTS

ADR View
ADR Sense
ADR Operate
ADR Trend
ADR Horizon

CLIENT TESTIMONIALS

« Data supplied by the Ampacimon system are constantly taken into account by our dispatchers, not only during normal operational but even more during tense situations. Our grid’s true real time limitations are therefore properly monitored at all times. Thanks to this very efficient investment, Elia can regularly avoid or defer the use of very costly grid actions. »

Raphaël Bourgeois
Head of Operations – National Control Center

 

 

BACK TO CASE STUDIES
Latest news

Ampacimon will participate at GE Grid Software Solutions Conference 1-3 October 2017, Leeuwenhorst, The Netherlands

September 7th, 2017|0 Comments

It is our pleasure to announce that Ampacimon will participate at GE Grid Software Solutions Confere [...]

Ampacimon ADR Sense-D sensor on network of SEI in Martinique

August 10th, 2017|0 Comments

Ampacimon just delivered its new Distribution product ADR-Sense D to the insular network of SEI in [...]

First Dynamic Line Rating system to be deployed in India!

August 10th, 2017|0 Comments

Very proud to announce that we will very soon deploy the first Dynamic Line Rating system in India, [...]