CASE STUDY #3
Summer/winter load peak management
Facts:
The French Alps sky resort “La Clusaz” is fed by a single 150-kV line. In the winter season, load increases very strongly, while it is very low in summer.
Constraints:
To manage this load increase in winter, the grid operator faces a large investment for only a few months use.
Ampacimon solution:
Installing the Ampacimon solution on this line granted a 40% increase in capacity of the existing line, and allows smooth operation during winter load peaks.
RELATED PRODUCTS
• ADR View
• ADR Sense
• ADR Operate
• ADR Trend
• ADR Horizon

CLIENT TESTIMONIALS
« Data supplied by the Ampacimon system are constantly taken into account by our dispatchers, not only during normal operational but even more during tense situations. Our grid’s true real time limitations are therefore properly monitored at all times. Thanks to this very efficient investment, Elia can regularly avoid or defer the use of very costly grid actions. »
Raphaël Bourgeois
Head of Operations – National Control Center
Latest news
Ampacimon takes over Spanish underground cable monitoring specialist DIAEL
Ampacimon recently acquired the Spanish underground cable monitoring specialist DIAEL. DIAEL’s part [...]
Join the next webinar on 14th January : Focus on Accelerating the Energy Transition: Dynamic Line Ratings for an Optimized Grid
Ampacimon and currENT organize the next DLR webinar on 14th January, 11.00-12.00 CET. It will focus [...]